TRINITY Group Construction

The Future of Energy

Leading the delivery of AI-ready data centers powered by KiNRG's HydroThermal Reactor. Zero grid impact. Continuous power. Maximum scale.

Trusted By ImageTrusted By ImageTrusted By ImageTrusted By Image
Led by a team at the forefront and future of renewable energy
Carbon Image
2x Lifespan of typical renewable systems
we create

How Does It Work?

Icon

HydroThermal Reactor

The HydroThermal Reactor is a hyperbolic concrete structure with a water injection system at thetop that introduces measured droplets of water through a distribution header.

Icon

Water Droplets

The water droplets introduced near the top of the Reactor immediately begin to react due to the Sun-warmed air at the very top of the Reactor.

Icon

Evaporation

The natural evaporative process immediately begins to cool the surrounding airinside the top of the HydroThermalReactor. As evaporation and cooling continues, the cooler/denser air inside theReactor descends, reaching speeds exceeding 50 mph.

Icon

Immense Acceleration

Thenow significantly colder, denser, damp, and compressed air amassed near the base of the Reactor flows laterally into tunnels surrounding the base of the Reactor, achieving wind speeds up to and well in excess of 100 mph.

Icon

Patented System of Turbines

Apatented system of turbines extracts the kinetic energy inside the wind tunnelsand generates GREEN ELECTRICITY.

Intellectual Property

01. Patent #8,120,191 | Efficient Energy Conversion Devices and Methods

This patent covers a novel hydraulic system capable of maintaining high efficiency hydraulic to electric conversion under a wide variance of wind speeds, as coupled to a plurality of wind turbines in wind tunnels. Issued 2/21/2012. USA

02. Patent #8,517,662 B2 | Atmospheric Energy Extraction Devices and Methods

This patent covers a structure for producing electricity, specifically a Tower capable of adding moisture at the top of the structure to hot-dry air so as to generate a down draft of wind within the interior of the Tower, vanes coupled to the exterior of the Tower that at least partially define a plurality of elongated pockets to the exterior of the Tower, and flaps located to redirect the incident wind downwards into tunnels to convert wind to electricity. Issued 8/27/2013. USA

03. Patent #8,643,204 B2| Efficient Energy Conversion Devices and Methods

This patent enhances and broadens previously issued Patent #8120191. Issued 2/04/2014. USA

04. Patent #8,727,698 B1| Atmospheric Energy Extraction Devices and Methods

This patent claims are targeted to represent the advantages of the new Tower structural shape, the configuration of the Tower walls, their composition as well as the wall thicknesses for a given height, along with more efficient construction methodology and enhanced wind force resistance over prior Tower designs. Issued 5/20/2014. USA

05. Patent #10,989,171 | Methods and Apparatus for Storage of Compressed Air Energy and the Release and Conversion of Compressed Air Energy

This patent relates to energy storage, and more specifically to the methods and apparatus to harness energy when natural energy sources are not readily available, including the storage and utilization of said energy. Issued 4/27/2021. USA

06. Patent #11,486,359 | Multi-Stage Wind Turbine

This patent covers the multi-stage wind power extractor features, including the circular tunnel with an expanding diameter and multiple turbines aligned inside. Each turbine has blades, a controller, and a motor. The controllers engage the turbines based on wind speed, and the motors power generators to extract energy. USA

07. Patent #65,031 | Multi-Stage Wind Turbine

This patent covers the multi-stage wind power extractor features, including the circular tunnel with an expanding diameter and multiple turbines aligned inside. Each turbine has blades, a controller, and a motor. The controllers engage the turbines based on wind speed, and the motors power generators to extract energy. Morocco

08. Patent | Multi-Stage Wind Turbine

This patent covers the multi-stage wind power extractor features, including the circular tunnel with an expanding diameter and multiple turbines alignedi nside. Each turbine has blades, a controller, and a motor. The controllers engage the turbines based on wind speed, and the motors power generators to extract energy. Kuwait

TRINITY Group Construction Overview

KiNRG and TRINITY GroupConstruction share leadership and office space, ensuring daily collaborationand strategic alignment. TRINITY is a wholly owned subsidiary of KiNRG. Theyhave been working together for over four years on this project.

Flip Wallen is the Founder of TRINITY Group Construction (TGC) and serves as the President of KiNRG. TRINITY Group Construction is a leading commercial general contractor based in the DC Metro area, focusing on mission-critical infrastructure.

TGChas extensive expertise in data center development, with over 2.5 millionsquare feet already built in the heart of Northern Virginia's Data Center Alley and more than 1.5 million square feet is under construction across four data center campuses; three located in the United States, and one globally.

Experienced in delivering complex, high-performance facilities with speed, precision, and scalability. Currently tracking over $1 billion in annual construction volume. Ranked #19 Largest General Contractor, #68 Top Private Companies, and one of the Mid-Atlantic region’s Fifth Fastest Growing Private Company by Washington Business Journal in 2025 and 2026.

we createwe createwe create

Small Hydrothermal Reactor

Solution Based on Existing Science

Replaces fossil fuels and more efficient than solar and wind

Continuous Clean Energy Production

24 Hours a Day, 7 Days a Week, 365 Days a Year

Most Cost-Effective Green Energy / Green Hydrogen Solution in theIndustry

Supports 200 MW AI Data CenterBaseload

Zero Carbon Footprint

Eliminates ~3 MILLION metric tons of carbon per installation per year.

we create

Competitive Analysis for AI Data Centers

Comparison of other 200 megawatt (MWH)
Baseload Capacity Production Facilities

Small Fission Reactor
HydroThermal Reactor
Small Fission Reactor
TBD
TBD
Fuel Replacement Every 10 Years
Zero Carbon Footprint
Operational Availability
TBD
2027
Installation Costs
TBD
$1.5 Billion
Longevity
Fuel Replaced 10 Years,LT Life TBD
75-100 Years
Generates Power24/7/365
Yes
Yes
Predictable Outcome
Yes
Yes
Tax/Carbon Credits
Yes
Yes
Environmental Impact
Zero Carbon Footprint
Zero Carbon Footprint
Decommissioning
Years of Monitoring After UseLife TBD
Concrete Structure Recyclable& Most Equipment Remarketed

Leadership

 Card Image

Ronald Pickett

Chairman

Bio

Ron Pickett, founder and CEO of his company since 2010, has had a varied career. He served as Youth Advisor toPresident Johnson before consulting for major corporations like Frouge and Gulf Oil on real estate deals, and later for Madison Square Garden Corporation on asset liquidation. He led multiple real estate projects in Maryland, Florida, and New York City and developed housing in Old Town Alexandria. In 1980, Pickett founded several innovative companies, including the first international telemedicine provider for ships, a major U.S. composting/recycling facility, and Telkonet, which pioneered broadband over powerlines.

 Card Image

Mil "Flip" Wallen

President

Bio

Flip, a 46-year veteran of the commercial real estate industry, specializes in mission-critical construction, particularly in the data center market. A James Madison University graduate with a BBA in Management Information Systems, he has developed over 3 million square feet of data center space in Northern Virginia's "Data Center Alley." Flip founded TRINITY Group Construction in 2002, a leading commercial construction company in the DC Metro area. He joined the company as Executive Vice President of Construction & Development in late 2020 and now serves as its President, advising on the integration of an Eco-Energy Park and GH2 plant with their HydroThermal Reactor Project.

 Card Image

Mark Aulabaugh

VP of Tower Development

Bio

Mark Aulabaugh is a Senior Construction Executive with 30+ years of experience driving growth and execution in the commercial concrete and petrochemical sectors. Known for scaling operations, building top-performing teams, and forging lasting client relationships, he brings a steady, impact-oriented approach to leadership across domestic and international markets. As Director of Business Development for Baker Concrete Construction’s DC region, Mark helped grow the business from $45M to $300M in annual revenue. Under his leadership, the team delivered high-profile projects across mission-critical, high-rise, and institutional sectors – expanding the firm’s footprint and deepening client trust. Mark’s international leadership experience includes overseeing large-scale industrial projectsacross the Middle East, South Africa, and the South Pacific during his time with Chicago Bridge & Iron. He holds a degree in Civil Engineering from Virginia Tech.

Secure Your Stake in the Future of Clean Energy

Invest in scalable, zero-emission technology redefining America’s energy independence. Partner with KiNRG today.

CTA Backgrunnd